Sam Arquitectura
 
 
WORK:
Executive Project and Management of construction work of the enlargement of university UAB of Economics in Bellaterra (Barcelona)

YEAR. 2005

SURFACE: 1.118m²

BUDGET: 840.000 €

CLIENT: UNIVERSITY OF ECONOMICS U.A.B.

ARCHITECT: SILVIA ÁLVAREZ MONTESINOS - ALBERT VITALLER
 
 




New Parking in Barcelona | High School Joan Oró | University of Economics of Bellaterra (U.A.B.) | Social Sciences Library of the University (U.A.B) | Urbanization and new accesses of "Park of Unity" | Urbanization of Bosc avenue & Alzina square | Urbanization of Raimon Casellas square | Urbanization of Mossen Cinto Verdaguer street | Urbanization of "Rectoria" street | Urbanization of M.J. Arnalot Gardens | New Primary Health Care Center (CAP) in Vilanova del Camí | Urbanization of Garrofers street | Urbanization of "Vista Park" | Urbanization of Mestre Serrano street | Urbanization of Pubilla Cases street | Urbanization accessed stairs to Garriga & Roca street | Industrial Urban planning of sector "Riu d'Arnes" | Remodeling technical spaces of UAB |
 
ENLARGEMENT OF THE UNIVERSITY OF ECONOMICS IN BELLATERRA (BARCELONA)  
 
 
  << (3 | 4) >>  
SITUATION OF THE PROJECT
This project consists to construct a new building to enlarge the ground floor and the first floor of the faculty of Economics at the University of Barcelona. The university is in a little city from Barcelona named “Cerdanyola del Valles”.
The available ground to construct this new building, rectangular in shape, is on the edge of east side of existing building. The surface of ground is a little inclined (5-6% variable slope) and the lowest level is to the south side.
 
MEMORY OF THE PROJECT
The proposal of this building consists to a central corridor with organized offices on each side and distributed in two floors. The connectivity point between the new building and the existing one is an access zone designed with a transparent corridor.
After analyzing the characteristics of the existing building that is structured around a central area of seven meters long, we conclude that this structure offers a pattern of management of first floor of the new building. This floor will be structured the same way.
The projected offices spaces can be both individual and collectives, variable from one unity that measures seven meters with a 3’5 meters modulation. Those offices are aligned along the collecting area of the corridor.
The stairs to the first floor and the emergency ramp to the ground floor (both placed in the transverse direction to the building “B3P”) are in the area of union between the two buildings.
The basic module is projected too for the façade, which are located sequentially a series of empty and filled finishes in white brick, alternating with large glazed windows.
 

     ABOUT US | PUBLIC WORKS | PRIVATE WORKS | COMPETITION | CONTACT